Matt’s Weekly Shop Update – April 20 2015

So this week I didn’t spend much time in the shop but I was able to finish up the gallery drawers. I completed the profiling of the drawer fronts and got them fit and well operating within their openings. I was lucky and found 3 walnut slabs on craigslist for $50 each. Over the weekend, Lindsay and I removed the underlayment from our family room as we prep for the hardwood floor install.

Slowvannah Farms: https://www.youtube.com/channel/UCI8ZXD9_g7DmkVnLh6yyLKw

Todd Clippinger:
https://www.youtube.com/toddclippinger

The Matt and Matthew Show:
https://www.youtube.com/channel/UCGyTDCoaGS921S1GKX3t7zg

Sponsors
Recent
Woodworking Projects

Walnut Dressing Vanity Build

To start things off, I’ll make the panel which will become the sides and top. While that’s sitting in the clamps, I’ll prep the material

2 Responses

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.